Close Menu
GH Bulleting
  • Home
  • Business
  • Politics
  • Entertainent
  • Featured
  • News
  • Sports
  • Africa
Facebook X (Twitter) Instagram
GH Bulleting
  • Home
  • Business
  • Politics
  • Entertainent
  • Featured
  • News
  • Sports
  • Africa
Facebook X (Twitter) Instagram
GH Bulleting
Home»Politics»Ghana Faces Power Crisis: Energy Ministry Seeks GH₵1bn with 2.6 Days of Fuel Left
Politics

Ghana Faces Power Crisis: Energy Ministry Seeks GH₵1bn with 2.6 Days of Fuel Left

nkqweziBy nkqweziMay 15, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Ministry of Energy and Green Transition has disclosed that it urgently requires GH₵1.1 billion to purchase liquid fuel for power generation, warning that existing fuel reserves are expected to run out in just 2.6 days.

The funding shortfall comes against the backdrop of a GH₵2 billion monthly deficit in the energy sector, a situation largely blamed on the Electricity Company of Ghana’s (ECG) inability to collect sufficient revenue.

Addressing the Parliamentary Energy Committee during a meeting with various stakeholders on Thursday, May 15, Minister John Jinapor raised alarm over the precarious state of the sector’s fuel supply.

“The fuel we have will last us just 2.6 days. Although we have placed orders for more fuel, these must be paid for. Some fuel has been procured on credit, and we are coordinating with the Ministry of Finance for payment. However, the Ministry of Finance also faces its limitations,” he explained.

Jinapor noted that discussions will be held at the Cabinet level to explore sustainable solutions, including private sector involvement in ECG operations to improve efficiency and revenue mobilisation.

Beyond the fuel crisis, the Minister also drew attention to persistent non-payment by public institutions. He revealed that Ghana Water Limited has failed to settle its electricity bills for the past seven months, despite continued power usage.

“Ghana Water Limited has not made any payment for the past seven months to the ECG but continues to consume the power,” he disclosed.

The situation adds to growing concerns about financial sustainability and accountability in the power sector, as government agencies and private consumers alike struggle to meet their payment obligations, threatening the stability of electricity supply nationwide.

ECG Ghana News GWL John Jinapor Ministry of Energy and Green Transition
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
nkqwezi

Related Posts

Afenyo-Markin Calls Mahama’s Radio Shutdown Pardon ‘Belated and Cosmetic’

June 12, 2025

Sam George to Radio Stations: Seize President’s 30-Day Grace Period for Compliance

June 12, 2025

BECE Candidate Welcomes Baby After Labour in Exam Room

June 12, 2025

A/R: Snake Causes Electrical Disruption in Ejisu Community

June 12, 2025

Mahama Pardons 64 Radio Stations, Orders Their Immediate Reopening

June 12, 2025

TotalEnergies CAF AFCON 2025, 2027 Welcomes TECNO as Official Global Sponsor

June 12, 2025

2025 President’s Cup: Kotoko vs. Hearts of Oak Scheduled for July 6

June 12, 2025

No Renewal for Zoomlion-YEA Contract, Says Presidency

June 12, 2025

ofi Ghana Enhances Learning for Over 1,000 Children in Cocoa Regions

June 12, 2025
Leave A Reply Cancel Reply

Latest News

Afenyo-Markin Calls Mahama’s Radio Shutdown Pardon ‘Belated and Cosmetic’

June 12, 2025

Sam George to Radio Stations: Seize President’s 30-Day Grace Period for Compliance

June 12, 2025

BECE Candidate Welcomes Baby After Labour in Exam Room

June 12, 2025

Accra 2025: Africa’s Innovators Converge for Africa Rising Symposium

June 12, 2025

A/R: Snake Causes Electrical Disruption in Ejisu Community

June 12, 2025

Mahama Pardons 64 Radio Stations, Orders Their Immediate Reopening

June 12, 2025
Ad
Facebook X (Twitter) Instagram
© 2025 GH BULLETING.

Type above and press Enter to search. Press Esc to cancel.